HOA
Navigating HOA Approvals for Impact Window and Door Installations in South Florida
How to Prepare:
1. Start Early in the Sales Process
- HOA approvals can take 2–8 weeks, depending on the community’s board schedule and level of scrutiny.
- Factor this timeline into project planning, especially if tied to hurricane season or a 40/50-year recertification deadline.
2. Educate the Client
- Let them know the HOA may require multiple documents and design conformity.
- Provide them with a clear list of what they’ll need to help expedite approvals.

What to Gather from the Client
- HOA Contact Information:
Property management company, HOA board, or architectural review board (ARB) contact details. - HOA Guidelines or ARB Rules:
Specific documents that outline what types of windows/doors, frame colors, or installation styles are approved. - Unit/Building Number & Floor Plan:
Some HOAs require reference to architectural layout or position within the building for approval. - Owner Authorization Form:
Signed authorization from the property owner allowing contractor submission (some HOAs require this). - Historical or Previous Submissions (if available):
Any past HOA approvals or denials can help tailor the application and avoid unnecessary rework.
What HOAs Typically Need in a Submission Packet
- Scope of Work Letter:
Detailed breakdown of what is being replaced (windows, sliding glass doors, French doors, etc.). - Manufacturer Cut Sheets:
Product documentation including dimensions, materials, and images of the proposed windows/doors. - Color Swatches or Finish Samples:
Frame color and finish must match existing architecture or HOA-approved palette (especially in condos). - Miami-Dade NOA or Florida Product Approval:
Required to show the product meets HVHZ compliance and building code standards. - Installer License & Insurance:
Active contractor license and proof of general liability and workers’ comp insurance. - Job Site Photos or Renderings (optional): Some HOAs may request before/after renderings, especially for highly visible installations.
What to Be Cautious Of:
Long Turnaround
Times
Some HOAs only meet monthly, and packets that are incomplete may be automatically deferred to the next meeting.
→ Tip: Submit a full, clean packet the first time to avoid delays.
Limits on Product Type or Appearance
Many HOAs require:
- Matching sightlines and frame colors
- Divided lite (grille) patterns or architectural detailing
- Specific tint levels or no tint at all
- No visible fasteners or flange-mounted products
"No Changes to Elevation" Clauses
Even if you’re improving the home, if your windows or doors change the exterior look, the HOA may flag it.
→ Tip: Use custom-finished frames and confirm that profiles are visually identical to original.
